Non-Compliance detail


  
Summary
 
Licence number: 1429
Annual Return Start: 31 Dec 2004
Annual Return End: 30 Dec 2005
Date Received: 03 Mar 2006
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 Testing for flouride and undifferentiated particles was carried out in accordance with prescribed methods to the extent permitted by the configuration of access galleries and ports at Monitoring Points 11, 12, 13 & 14. Appropriate Action taken by licensee 1
M6.1 Daily discharge volumes were not available for a period of time during the control system changeover from the old analogue to the new digital ICMS. This included time taken after the changeover to calibrate and fine tune the data input system. Appropriate Action taken by licensee 1
M Point 16 Ambient Air monitoring station at Dora Creek - data for temperature at 2M and 10M, rainfall and solar radiation was not available until June 2005 due to delays by contractor in installing instrumentation. Appropriate Action taken by licensee 1
M Point 13 Discharge and Monitoring Point 13 - Boiler 3 discharge to stack as shown on site plan ER328067A. Yearly analysis for Volatile Organic Compounds was not undertaken. Appropriate Action taken by licensee 1